K&L Construction Case Study: Heavy-Use Area Technology Solution
Construction of a Dry Lot with Grid System to
• Eliminate Erosion, Mitigate Mud
• Improve High-Traffic Gate Areas
• Preserve Pasture
• Accommodate new Nelson automatic waterer, run-in shed, feeding platform
• Reduce maintenance, elevate enjoyment of use of space for horses and humans!
- Before
- Before
- Grid System prepared for installation
- Topsoil stripped and and subsurface graded
- Stonedust delivery. Rgt foreground: special compacted base for run-in shed pad.
- Grid System stretched and staked out across center of the dry lot to reduce erosion from water draining across the surface.
- Half of the Grid System filled with stonedust
- Detail of filled In Grid System
- AFTER
- AFTER
- AFTER